Reports and submission

What to include in a cable schedule export

Use consistent circuit references, end points and revision details across the workbook and schedule.

Applies toLow-voltage AC cable worksheet

1. Complete the identifiers

Enter the project name, cable tag, from and to locations, and revision before downloading the schedule. These fields identify the circuit outside the worksheet.

2. Check the revision

Compare the selected section and snapshot reference in the schedule against the calculation workbook from the same inputs.

Try the cable sizing worksheet

Compare candidates with your own circuit data.

Open tool