ElectricalPlanned

Protection Coordination

Time–current curves and selectivity between devices

Design inputs

Upstream and downstream protective devices, their settings, manufacturer time–current curves and fault current at each location.

Planned outputs

A comparison of device curves and the current range over which each pair provides selectivity. Device pairs requiring review are identified.